GCO : solides performances opérationnelles au 1er semestre 2022, un second semestre plus incertain (French only)
Read the Press Release
Grande Côte Opérations (GCO), a subsidiary of the Eramet Group, has signed a Memorandum of Understanding with CrossBoundary Energy for the construction of a 13MW hybrid solar power plant with 8 MW of battery storage.
The plant is dedicated to the Diogo mineral sand production site (north-western Senegal), and is scheduled […]
July 29, 2021
Grande Côte Opérations produced 362,000 tons of mineral sands in first half of 2021. These results should be credited to the teams, who are also involved in supporting the local communities.
Mineral sands production remained stable in the first half of 2021. The slight reduction in average mineral sand […]
Diogo, July 14, 2021
On Wednesday morning, Grande Côte Opérations unveiled the new healthcare station it recently built in Diogo-sur-Mer. The two-story building comes fully stocked to allow the future head nurse and his attendants to treat the local population. It can accommodate up to 15 patients.
The healthcare station was constructed […]